본문으로 바로가기

포스코에너지

SUB LINK

  • HOME
  • SITEMAP
  • KOREAN
  • Company
    • Overview
    • Vision of POSCO
    • Vision of POSCO ENERGY
    • History
    • CEO Message
    • CI
      • CI
      • Identity
    • Location
    POSCO History Go Brand Identity Go
    closed
  • Business
    • Business Overview
    • Renewable Energy
      • Photovoltaic/Wind Power Generation
      • Waste to Energy
    • Power Generation
      • LNG Combined Cycle Power Generation
      • Off-Gas Combined Cycle Power Generation
      • LNG Terminal Project
    • Global Business
    closed
  • Financial Info.
    • Financial Highlights
    • Credit Rating
    Income Statement Go Financial Position Go
    closed
  • Sustainability
    • Sustainable Management System
    • Sustainability Report
    • Ethical Management
      • Business Ethics
      • Ethics Program
    • Environmental / Safety & Health Management
      • Environmental Management
      • Safety-Health Management
    • Shared Growth
      • Shared Growth Concept
      • Shared Growth Programs
    • CSR
      • CSR Strategy
      • CSR Programs
      • Participation in CSR
    CSR Strategy Go
    closed
  • PR Center
    • News
    • PR Center
    closed
With POSCO

Coal-Fired Thermal Power Generation

Coal-Fired Thermal Power Plant in Samcheok

We have actively moved forward with the coal-fired thermal power business
with the launch of our subsidiary.

2100

Power Plant Overview

  • Name

    SC bluepower

  • Location

    Jeongno-dong and its surrounding areas,
    Samcheok, Gangwon-do

  • Site area

    1,143,651m2

  • Fuel

    Coal(bituminous coal and
    sub-bituminous coal)

  • Composition(MW)

    2,100MW in total
    (1,050MW x 2 units)

  • Completion date

    2024

Korea’s top eco-friendly Coal-Fired Thermal Power Plant

Reusing a former limestone mine

The Coal-Fired Thermal Power Plant in Samcheok is an eco-friendly power generation facility
built on a former limestone mine to minimize environmental impact.

Benefits of reusing a former limestone mine

  • No need to damage the landscape or forested land for construction
  • No need to relocate local residents, zero impact on quality of life
  • No backfill needed before constructing the facility
  • Lower terrain that visually shields the facility
  • Location on the East Sea with prevailing westerlies to minimize impact of air pollutants
  • Complete recycling of coal ash

Application of eco-friendly generation equipment

POSCO ENERGY plans to install efficient and eco-friendly ultra-supercritical generation equipment,
investing about 510 billion KRW in environmental management facilities to minimize the release of pollutants.
By establishing our own internal standards that are much more stringent than the Ministry of
Environment’s particulate emission standards, our new plant will be Korea’s most eco-friendly
Coal-Fired thermal power generation facility.

유연탄발전소 환경부 요구 수준과 삼척화력 설계기준의 오염물질 제거율 내용이 보여집니다.
Classification MoE Requirement
(Yeong heung Thermal Plant)
Samcheok Thermal Plant
Design Specifications
SOx(ppm) 25 15
NOx(ppm) 15 10
Dust(mg/㎥) 5 4

Pollutant removal rate(unit: %)

삼척 유연탄발전소 오엽물질 제거율 그래프. 황산화물 제거율 98.5%, 질소산화물 제거율 94%, 미세먼지 제거율 99.963%

Ensure the scattered dust

POSCO ENERGY maintains a fully-enclosed eco-friendly coal handling line, extending from offloading to the conveyor,
warehouse storage and stacker/reclaimer, to ensure that dust scattering is completely neutralized.

    • 하역
    • 운반
    • 옥내저장
  1. 비산먼지 환전 차단

    Enclosed eco-friendly handling system
    ensures zero dust

Contributions to the local economy

POSCO ENERGY is playing an important part in local economic development with the construction
of the new plant by creating new jobs and infusing more vitality into Samcheok’s economy.
With a co-development agreement signed with the city totaling 568 billion KRW, POSCO ENERGY is taking
the lead in local economic development with regional partnership projects and renewable energy initiatives.
The construction of the plant will provide 1,500 to 3,000 jobs per day for the duration of the project
and inject over 1.4 trillion KRW into the local economy.

hide
  • Company
    • Overview
    • Vision of POSCO
    • Vision of POSCO ENERGY
    • History
    • CEO Message
    • CI
    • Location
  • Business
    • Business Overview
    • Power Generation
    • Renewable Energy
    • Global Business
  • Financial Info.
    • Financial Highlights
    • Credit Rating
  • Sustainability
    • Sustainable Management System
    • Ethical Management
    • Environmental /Safety & Health system
    • Shared Growth
    • CSR
  • PR Center
    • News
    • PR Center
    • Table Tennis TEAM
Refuse to illegally collect e-mail address Privacy Policy 16F, POSCO Center West Wing, 440, Teheran-ro, Gangnam-gu, Seoul, 135-933 Rep. of KOREA

Copyright(c) 2018 poscoenergy all right reserved.